TM-35 Double Wall Paper Cup Machine is the automatic machine through the procedure of automatic paper feeding, sealing, gluing, to make double layer or ripple layer for inner cup to avoid heat. Machine has a very cheap price to start your business on double layer cups.
Name |
Paper Cup Sleeve Machine |
|
HS Code |
8441309000 |
|
Model |
TM-35 |
|
Paper Cup Size |
8-20oz or customize |
|
Raw Material |
PE coated paper, ripple paper, paper card, grey paper board, etc. |
|
Speed |
40-50pcs/min |
|
Speed of 20 hours stable running per day |
||
Voltage supply |
220v50hz single phase/ 380v50hz 3-phase (better to use 380v50hz 3-phase) *If user’s voltage supply is different, please inform us in advance. |
|
General power |
4.7kw |
|
Air Source |
0.6MPA |
|
Net weight |
1500kgs |
|
Measurement |
2150*950*1650mm |
|
Cup Side Sealing |
EVERGREEN Ultrasonic sealing |
|
Bottom Knurling |
Heater Knurling |
|
We can customize machine and mold according to customer’s requirement. |
||
Easy to operate the machine , only need one worker to operate the machine.
Easy to operate the machine , only need one worker to operate the machine.
Easy to operate the machine , only need one worker to operate the machine.
Easy to operate the machine , only need one worker to operate the machine.
Easy to operate the machine , only need one worker to operate the machine.
Good quality metal and steel used for the machine body and machine cover.
Good quality metal and steel used for the machine body and machine cover.
Automatic alarm and stop, adopt 4 sensors detecting the production.
Automatic alarm and stop, adopt 4 sensors detecting the production.
TM-35 uses 30mm big shaft and big 125# gear box.
TM-35 uses 30mm big shaft and big 125# gear box.
TM-35 uses 30mm big shaft and big 125# gear box.
TM-35 uses 30mm big shaft and big 125# gear box.
1. The guide booklet will be sent with machine to guide the installation process works, adjust the whole machine, production, avoid or solve the problem which the buyer will face.
2. Test run of the machine & training:
a) We will adjust the machine well for one week before the delivery, ensure the machine has the perfect performance.
b) If the technicians are asked to install machine and training the workers at buy’s factory , the buyer should pay all fees.
3. Training of buyer in China:
a) We supply the free training of buyer at our factory, the training won’t stop until the buyer control the whole lesson! The cost of air ticket, boarding and lodging should provided by buyer.
4. We supply the consumable spare parts for free for one years use.
We warranty against any defects in design and workmanship for 1 year from the shipment date
This warranty won’t be applied to parts which are subject to wear and require normal replacement and to the durability of condition
We are not responsible for the damage caused by misuse, improper handling, neglectful maintenance, force injury and other reasons beyond our responsibility.
Product Recommendation
Latest News
GET A QUOTE